This project required a hydrological study that determined the need for rehabilitation in the hydraulic, electromechanical, and electrical engineering facilities.
Due to the passage of time in the infrastructure of the PTAR, which showed deficiencies, corrective maintenance, and conservation actions were carried out, to make the plant operationally efficient.